Customization: | Available |
---|---|
Type: | Spray Booth |
Certification: | CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1: The Product Description of Spray booth:
2. The Technical parameter of Spray booth:
MODEL:SS-9100 | ||||||
Outside Dimension (mm) | 7006*5460*3420(L*W*H) | Inside Dimension(mm) | 6900*4000*2650(L*W*H) | |||
Front Door(mm) | 3000*2600(W*H) | Service Door (mm) | 650*1800(W*H) | |||
Total Power | 9KW | Total Weight | 3.8t | |||
Cabin System | Wall panel | 50mm EPS sandwich panel, steel sheet thickness: 0.426mm | ||||
Ceiling panel | 0.8mm galvanized steel sheet. | |||||
Basement | 300mm depth, two rows grids and three rows checkered plates. | |||||
Ramps | Two pieces 2000*600mm ramps | |||||
Glass | 5mmsafety tempered glass | |||||
Windows | Square glass windows | |||||
Air Make-up System | Air Inlet fan system | 1*7.5kw turbo fan | ||||
Exhausted fan system | For option | |||||
Air capacity for fresh air | 22000m3/h | |||||
Exhausted ducting | 4meters straight ducting, one 90°elbow and one 45°elbow. | |||||
Purification System | Pre-filter | G3 grade | ||||
Ceiling filter | EU5 / F5 | |||||
Floor filter | Fiber glass filter / G3 grade | |||||
Exhausted fan filters | Fiber glass filter and active carbon | |||||
Heating System | Heat exchanger | SUS304 material, argon arc welding. | ||||
Heating burner: | RielloG20 diesel oil burner | |||||
Heating productivity | 180000Kcal/h | |||||
Spray to baking switch | Pneumatic damper | |||||
Chimney ducting | 3 meters stainless ducting and one chimney elbow | |||||
Max heating temperature | 80ºC | |||||
fuel consumption | 6-8L/vehicle | |||||
Lighting System | Ceiling lights | 8 Units, each 4 * 18W LED lamps. Total 576 W | ||||
Side lights | Side lights For option | |||||
Illumination | 800LUX | |||||
Controlling System | Switched control panel | Spraying & baking A33:G51switch,lighting switch, emergency stop, breakdown alarm, failure alarm |